Controlled Power, Inc.
17909 Bothell Everett Hwy SE Suite 102
Bothell, Washington 98012
Phone: 425.485.1778
Fax: 425.485.0658
Nanpil Hydroelectric Project,
Pohnpei Public Utilities Corp.
Delivered Jan 2006.
View Slides in New Window
This project located in the Federated States of Micronesia consists of two
sections of General Electric AV5, 480 VAC rated switchgear and a 3-section
generator control panel.
The Nanpil Hydroelectric Powerhouse is a run of the river project using two Francis type turbines generating just over 2 megawatts of power. Control automation is from a GE Fanuc Series 90 PLC with QuickPanel Control operator interface and Clifton Labs Hydro-Synch 100 automatic synchronizers.