Controlled Power, Inc.
17909 Bothell Everett Hwy SE Suite 102
Bothell, Washington 98012
Phone: 425.485.1778
Fax: 425.485.0658
Midway Island, Powerhouse
Delivered April 2005.
View Slides in New Window
This prime power project located on the site of the famous battle in the
Pacific during World War II consists of five sections of General Electric AV5
switchgear connected to two 450 kW Caterpillar diesel electric generators.
Automation is provided by a GE Fanuc Series 90 PLC and a 15-inch color operator touch screen. Woodward DSLC controllers provide synchronizing and loading controls. Automated control functionality includes demand control, feeder control, metering and annunciation.